Reading Settings
Font Size
16px
Line Spacing
1.6
Reading Width
900px
Font Share
Theme
Text To Speech

50: Large-scale production arrangements

"Spirit Eye, you can arrange the layout of the production lines now."

Brian instructed Spirit Eye.

Spirit Eye responded quickly: "Understood, creator. I will do my best to arrange the production matters. So, creator, how should the number of these production lines be arranged?"

"Hmm, let me think. Spirit Eye, what is the footprint of the magic gun and small magic missile production lines?" Brian thought for a moment, then asked Spirit Eye.

Spirit Eye immediately pulled up the relevant data, and a detailed planning diagram appeared on the screen:

"creator, the upgraded level 4 magic gun production line occupies an area of 200 square meters per line.

This includes a 20 square meter safety buffer zone and a 10 square meter magic circulation device placement area.

The small magic missile production line is slightly larger, requiring 300 square meters per line.

Of this, 150 square meters are used for producing small missiles, 100 square meters for assembling launch devices, and 50 square meters for the Magic Formation superposition area."

"So, level 4 magic guns are 200 square meters per line, and small magic missiles are 300 square meters per line, then?" Brian said, deep in thought.

Brian thought for a moment, feeling that he should have a comprehensive understanding of the production lines.

Then he said to Spirit Eye:

"Spirit Eye, help me calculate the daily output of the level 4 intelligent robot, level 4 magic gun, and level 4 small magic missile production lines."

Spirit Eye quickly initiated the calculation program, incorporating data such as process parameters, Magic Formation engraving efficiency, and magic power supply speed into the analysis model for each production line.

Soon, a detailed capacity report appeared before Brian:

"creator, according to the simulation, a single level 4 intelligent robot production line can produce 5 units per day;

A single level 4 magic gun production line has a daily output of 50 guns;

A single small magic missile production line has a daily output of 50 missiles and 2 four-thread spatial storage launch devices."

"Spirit Eye, what about their production line costs?"

Spirit Eye quickly retrieved the cost analysis data, and rows of precise numbers appeared on the screen:

"creator, the total cost for a single level 4 intelligent robot production line is 80,000 intermediate magic stones;

A single level 4 magic gun production line costs 60,000 intermediate magic stones;

A single small magic missile production line costs 100,000 intermediate magic stones."

Seeing that the cost of the production lines was not too high, Brian asked Spirit Eye again:

"Spirit Eye, please help me integrate the cost of a complete intelligent robot equipped with a level 4 robot, a level 4 magic gun, 2 launch devices, and 200 missiles. What is the cost of one such unit?"

Spirit Eye quickly retrieved various cost data:

Cost of a level 4 intelligent robot body: 5000 intermediate magic stones;

Cost of an upgraded level 4 magic gun: 3000 intermediate magic stones;

Manufacturing cost of 2 launch devices: 1000 intermediate magic stones each. Total 2000 intermediate magic stones. (Spatial Magic Formation and materials, cost increases linearly compared to level 3);

Consumption of 200 small magic missiles: 30 intermediate magic stones each, total 6000 intermediate magic stones;

Additional expenses, including magic power loss and labor costs during the production process: less than 1 intermediate magic stone, negligible.

Soon, a detailed cost breakdown appeared before Brian:

"creator, after precise calculation, the cost of a single fully equipped intelligent robot is 16,000 intermediate magic stones."

Brian thought aloud:

"I see. It's neither cheap nor expensive, acceptable.

500 level 4 intelligent robot production lines, occupying 100,000 square meters, placed on the 4th floor of Factory No. 1, perfectly occupying one floor;

100 level 4 magic gun production lines, occupying 20,000 square meters, placed on the 5th floor of Factory No. 1;

2600 small magic missile production lines, occupying 780,000 square meters, placed on the 5th and 6th floors of Factory No. 1, and Factory No. 2."

"In this way, we can produce 2500 intelligent robots, 5000 magic guns, 130,000 small magic missiles, and 5200 launch devices every day."

Then Brian began to instruct Spirit Eye,

"Spirit Eye, I'll leave the work of purchasing and debugging the production lines to you.

Production of level 4 intelligent robots can pause after 100,000 units.

Produce 300,000 level 4 magic guns, estimated to equip each robot with one spare. The rest will be handed over to me then.

Produce 100 million level 4 small magic missiles and 400,000 launch devices. Each robot will be equipped with 2 units (directly installed on the rear shoulders, one on the left and one on the right).

The other two units and the remaining magic missiles will be stored in the Mage Tower's spatial cabinet for use when needed."

Brian arranged production-related tasks with Spirit Eye.

Spirit Eye quickly entered the production instructions into the system, simultaneously calling up the factory space distribution map for verification:

"creator, according to the current plan, based on daily output capacity,

Producing 100,000 intelligent robots will take 40 days;

300,000 magic guns will take 60 days;

100 million small magic missiles will take 769 days, and launch devices will take 77 days."

Brian frowned, then nodded in approval:

"Alright. It's just that the production of small magic missiles will take 2 years, which is a bit slow.

Never mind, there's still time, so let's arrange it this way.

Additionally, strict quality control must be maintained during the production process. Every product must undergo detailed inspection, and no defects are allowed."

Spirit Eye responded: "Understood, creator. I will set up multiple quality inspection stages to ensure all products meet standards."

Brian thought for a moment, still feeling that the production of small magic missiles was too slow, so he asked Spirit Eye again:

"Spirit Eye, if I specifically build a production line that only produces small magic missiles, how many small magic missiles can that production line produce per day?"

Spirit Eye immediately readjusted the calculation parameters, focusing all production line resources on the small magic missile production scenario, while optimizing the magic power supply link for the Magic Formation superposition process:

"creator, if a dedicated production line solution is adopted, the daily output per line can be increased to 200 missiles.

By simultaneously carrying out Magic Formation engraving and missile body assembly processes, combined with an automated magic power stabilizer infusion device, production efficiency is increased by 400% compared to a mixed production line.

However, a new magic power circulation cooling system is required, and the cost of a single dedicated line will increase to 120,000 intermediate magic stones."

Brian felt that the dedicated production line was very practical, as it could speed up production by 4 times.

Then he instructed Spirit Eye:

"I see! Then, Spirit Eye, use the city builder to construct a Factory No. 3 next to Factory No. 2. This factory will specialize in producing small magic missiles, using this dedicated production line.

In this way, one factory can accommodate 2000 production lines, which can increase the output of small magic missiles by 400,000 per day.

Adding that to the previous output, it means we can produce 530,000 per day, and 189 days would be enough, so about half a year to produce 100 million."

Spirit Eye quickly outlined the shape of Factory No. 3 in the virtual modeling interface, synchronizing the spatial structure parameters and magic power conduction nodes to the factory construction system:

"Understood, creator. I will arrange for the city builder to start working immediately."

"Hmm, good. Just remind me tomorrow to go to Factory No. 3 to engrave the Magic Formation. Let's stop here for today, I'm going back to eat."

Brian gave Spirit Eye an instruction, then started walking back towards the castle.

Prev Next

🔊 Text To Speech

Listen while reading

Ready